Our EPC approach

Engineering, Procurement, Construction: a six-step method and single-point responsibility, from the first study to handover.

The method

Six steps, each with its deliverables

Each step ends with clear deliverables and a decision: proceed, adjust or stop. You stay in control of the project and its budget.

Feasibility and business case

We start from your objective and the site data to check that a project stands up — technically, administratively and financially — before significant costs are committed.

  • Site analysis
  • Use cases
  • Preliminary sizing
  • Connection options
  • CAPEX / OPEX
  • Sensitivity analysis

Sizing and engineering

The system is defined in detail: power, energy, electrical architecture, layout. Simulations account for battery ageing and real operating conditions.

  • Single-line diagrams
  • Grid connection study
  • Protection and earthing
  • Layout drawings
  • Civil design
  • Fire protection
  • Noise study

Permitting and grid connection

We prepare the applications, submit them and follow up with the relevant bodies until decisions are issued.

  • DSO connection request
  • ESTI plan approval
  • Building permit
  • Coordination with authorities

Procurement

Equipment is specified and then selected on technical, economic and warranty criteria. We monitor manufacturing and carry out factory acceptance where relevant.

  • Batteries and BMS
  • Converters (PCS)
  • Transformers
  • MV switchgear
  • EMS / SCADA
  • Factory acceptance tests (FAT)
  • Logistics

Construction and installation

We manage the site and coordinate the trades, keeping to schedule with constant attention to safety.

  • Civil works and foundations
  • Container installation
  • MV / LV cabling
  • Control systems
  • Site safety

Commissioning and handover

The plant is tested, its performance measured and compared with the guaranteed values, then handed over with its complete documentation.

  • Site acceptance tests (SAT)
  • Performance tests
  • Grid compliance
  • Prequalification support
  • Training
  • As-built documentation
Our commitments

What is not up for negotiation

Safety

Fire protection concept, electrical safety and site safety addressed from the design stage.

Compliance

Applicable standards and regulations, and the requirements of the grid operator and authorities.

Measured performance

Capacity, efficiency and availability verified by testing and compared with guaranteed values.

Transparency

Assumptions, calculations and equipment choices documented and explained.

And after handover?

An asset built to last

A battery operates for fifteen years or more. We prepare for that phase from the design stage and can support you afterwards.

  • Performance monitoring. Capacity, efficiency and availability indicators.
  • Maintenance. Preventive maintenance plan and coordination of interventions.
  • Warranty management. Follow-up of manufacturer warranties and performance commitments.
  • Upgrades. Capacity augmentation and adaptation to new markets.

Stand-alone assignments

Study only
Feasibility, sizing or business case, with no commitment to what follows.
Owner’s engineering
Technical support for the owner or investor: specifications, bid analysis and supervision.
Detailed engineering
For a project that is already developed and permitted.
Full EPC
The whole scope, under single-point responsibility.
FAQ

Frequently asked questions

What does an EPC contract for a BESS include?

Engineering (studies, drawings, diagrams, permit applications), procurement of all equipment (batteries, converters, transformers, switchgear, control systems) and construction through to commissioning and handover. The exact scope, interfaces and warranties are defined in the contract.

Can you take on just part of a project?

Yes. We also carry out stand-alone assignments: feasibility study, sizing, business case, grid connection application, owner's engineering or detailed engineering for an already-developed project.

How long does a BESS project take?

It depends mainly on two factors outside the construction site: grid connection and permitting lead times, and delivery times for the main equipment, particularly transformers and medium-voltage switchgear. Construction itself is comparatively quick. We draw up a realistic schedule from the feasibility stage.

How is the plant's performance verified?

Through commissioning tests: usable capacity, round-trip efficiency, power, response time and compliance with grid-operator requirements. Results are recorded in a test report and compared with the contractually guaranteed values.